Engineering
Engineering Projects
- Currently Bidding Projects (QuestCDN)
- Currently Bidding Project (HLA) – 新葡京网上赌场 Northside Alley Paving Project
- Engineering Bid Summaries
- RFQ’s & RFP’s
Engineering Standard Details and Specifications
- Water Std Specs & Details
- Sewer Std Specs & Details
- Drainage Std Specs & Details
- Roadway Std Specs & Details
- Electrical Std Specs & Details
- WSDOT Standard Plans and Specifications
Engineering Private Development Resources & Permits
- Private Development Resources
- Excavations in Right of Way – Municipal Code
- Excavation Permit – Street-Break
Traffic Engineering
Traffic Engineering is responsible for developing and maintaining traffic signal operational plans, design and review of traffic signals, striping, sign layouts, as well as traffic studies, collision analysis, collection of transportation system data, traffic impact reviews for proposed developments, transportation planning and grant applications.
Engineering Personnel Contact Information
Other Engineering Links
- Learn about Yakima’s Local Improvement District (LID) for your neighborhood
- Request for Consultant Qualifications and Small Works Roster registration (PDF)
- Citywide Pavement Condition Index (December 2015)
- Citywide Pavement Condition Report (August 2021)
- 6-year Transportation Improvement Program – 2021 to 2026
- 6 Year Transportation Improvement Program – 2022 to 2027
- 6 Year Transportation Improvement Program – 2023 to 2028
- 6 Year Transportation Improvement Program – 新葡京网上赌场 to 2029
- April 新葡京网上赌场 TIP Amendment – Nob Hill Blvd 28th Ave to 40th Ave Paving
- 6-Year Transportation Improvement Program – 2025 to 2030